The Project in Numbers
Key indicators
38,737 m²
storage space
2,742 m²
office space
20,000 m²
3-level mezzanine
10,70 m
clear height
up to 6.5 t/m²
floor load capacity
Answear
e-commerce fulfillment center
Challenges
What challenges did we face in this project?
High-intensity operations
The project had to support a fulfillment environment characterized by high operational density and high process efficiency.
Multi-level mezzanine and heavy loads
The facility required a multi-level mezzanine structure with high floor load-bearing capacity and a flexible operational layout.
Adaptation to permanent employment and formal requirements
It was essential to meet the standards for permanent work and to complete the approval process, including obtaining the necessary exemption from technical requirements.
7R Solutions
How we carried out the project
Efficient HVAC systems
We completed a mezzanine with a total area of 20,000 m², which significantly increased operational capacity and improved space utilization.
Technical specifications supporting a flexible layout
The facility was designed with a floor load capacity of up to 6.5 t/m² and a clear height of 10.70 m, which supports demanding operational layouts.
Adaptation to permanent employment and formal support
7R completed the process of obtaining the necessary exemption from technical requirements, which enabled the implementation of the final functional layout in accordance with the client's requirements.
Scope of work
Project Objectives
A scalable fulfillment environment for e-commerce
High operational capacity and layout flexibility
Functional, technical, and formal compliance with the target operating model
Scope of work
Scope of Work 7R
Implementation of a build-to-suit project for e-commerce
Implementation of a multi-level mezzanine and parameters supporting high-intensity operations
Support for formal agreements regarding the final configuration of the facility
Schedule
Implementation Schedule
1
Functional and technical design
designing the facility layout to accommodate intensive fulfillment operations, continuous operation, and high process density
2
Construction of the building and mezzanine
construction of warehouse and office space, as well as a three-level mezzanine to increase operational capacity
3
Arrangements and final launch
conducting the formal process and preparing the facility for its intended operational model
Results
Measurable project outcomes
38,737 m²
storage space
20,000 m²
three-level mezzanine
up to 6.5 t/m² and 10.70 m
features that support high-volume fulfillment operations and a flexible layout
Gallery
Photographic documentation