The Project in Numbers
Key indicators
44,000 sq. m. of GLA
Modern logistics space
Yusen Logistics
tenant of the property
95,6%
in BREEAM International New Construction v6
more than 50%
lower operational CO2 emissions*
~ 80%
lower annual primary energy demand
BREEAM Outstanding
the highest score in Europe
Challenges
What challenges did we face in this project?
High operating costs
The goal was to create a facility that would reduce operating costs and improve energy efficiency in the long term.
The need for scalable space
The project had to meet the needs of a growing logistics operator and provide space to support the company’s continued growth.
Expectations of greater operational efficiency
The facility was intended to enable the implementation of modern technological improvements and provide greater control over energy consumption.
7R Solutions
How we carried out the project
Efficient HVAC systems
Close coordination We installed high-efficiency heat pumps and ventilation with heat recovery to reduce energy consumption and improve the building's performance.
Smart building management
An advanced BMS system and energy-efficient LED lighting with DALI control support the ongoing optimization of the facility's operations.
Self-generated energy and greater independence
A photovoltaic system and on-site energy storage improve operational efficiency and enhance the facility’s resilience to fluctuations in energy costs.
Scope of work
Project Objectives
Maximizing energy efficiency
Real operational savings for the tenant
High environmental quality confirmed by certification
Scope of work
Scope of Work 7R
Design and construction of the facility to the 7R Green Saver standard
Implementation of technological and energy solutions
The BREEAM Outstanding certification process
Schedule
Implementation Schedule
1
Design and customization of solutions
development of technical and environmental specifications
2
Project Implementation
implementation of key building and energy systems
3
Acceptance and certification
Preparing the building for the project and confirming the parameters in BREEAM
Results
Measurable project outcomes
>50%
lower operational CO2 emissions
~80%
lower annual primary energy demand
95,6%
A BREEAM Outstanding rating, the highest achieved by an industrial building in continental Europe
Gallery
Photographic documentation
The score confirms the innovative nature of the solutions implemented in the 7R Green Saver facility, designed to maximize benefits for tenants and investors.