7R Park Gdańsk IV: a modern warehouse with BREEAM Outstanding certification

7R Park Gdańsk IV is a modern warehouse project being developed by 7R as the developer and co-investor. The facility, fully leased by Multilet, was designed with high operational efficiency, reduced energy consumption, and long-term environmental optimization in mind. The project has received BREEAM Outstanding certification for both phases of the development.

  • 7r Park
  • Multitenant
  • Multilet
  • Location: Gdańsk
  • GLA: 41,000 sq ft
  • Year: 2025
7R Park Gdańsk IV: a modern warehouse with BREEAM Outstanding certification

The Project in Numbers

Key indicators

41,003 m² GLA

Modern logistics space

11,566 m²

Phase I GLA

30,437 m²

Phase II GLA

Multilet

project fully leased

88.8% and 90.2%

BREEAM Outstanding ratings for Phases I and II

60.8% and 43.3%

Reduction in energy demand compared to the Polish NZEB standard, for Phases I and II

Challenges

What challenges did we face in this project?

Long-term operational efficiency

The goal was to create a building that combines high environmental standards with practical efficiency in everyday use.

Monitoring of energy consumption and emissions

The project involved the implementation of systems to enable real-time monitoring of actual energy consumption and operational CO2 emissions.

Net book value

A key objective was to maintain full control over the building’s operational parameters in order to support its long-term optimization and investment value.

7R Solutions

How we carried out the project

High-efficiency HVAC systems

The building features air-to-air heat pumps for heating and cooling, mechanical ventilation with heat recovery, and air handling units with heat recovery and CO2 sensors. These solutions reduce energy loss and adapt the system’s operation to the actual needs of the occupants.

Improved energy efficiency of the facility

The project includes enhanced insulation, improved airtightness of the building, and airtightness tests, which have helped reduce heat loss and improve the building's energy performance.

Smart management and self-generated energy

A BMS system, DALI lighting control, and a 250 kWp PV system have been installed. As a result, the building benefits from automation, manages energy consumption more effectively, and helps reduce its operational carbon footprint.

Scope of work

Project Objectives

High energy efficiency in practice

Monitoring of real-time operational data

Long-term optimization of asset value

Scope of work

Scope of the project

Design and construction of the facility to the 7R Green Saver standard

Implementation of technological and energy solutions

The BREEAM Outstanding certification process

Long-term management of a building's operational efficiency

Add a reply.

Schedule

Implementation Schedule

1

Design and selection of solutions

development of the facility's technical and environmental specifications

2

Implementation of the two phases of the project

implementation of energy systems, automation, and solutions that promote energy efficiency

3

Certification and Operational Optimization

Confirmation of the BREEAM Outstanding rating and preparation of the building for long-term performance monitoring

Results

Measurable project outcomes

BREEAM Outstanding

88.8% for Phase I and 90.2% for Phase II

Lower energy demand

60.8% less in Phase I and 43.3% less in Phase II compared to NZEB

The building is extremely airtight

Phase I, n50 = 0.26 and qe50 = 1.18 m³/h/m²
Phase II, n50 = 0.13 and qe50 = 0.72 m³/h/m²

Full control over operational data

The building enables continuous monitoring of energy consumption and operational CO2 emissions

Gallery

Photographic documentation

At 7R Park Gdańsk IV, we have combined high environmental standards with solutions that support real operational efficiency. This project was designed not only to achieve certification, but also to enable long-term analysis of data and results.

Oskar Pacut,

Director of Technical Development, 7R

Similar projects

BTS for Answear: Scalable Fulfillment Center in Krakow

Read the Case Study

Similar projects

BTS for Hultafors: Production and Warehouse Facility with AutoStore

Read the Case Study

Similar projects

BTS for FIEGE and Zalando: Large-Scale Returns Logistics

Read the Case Study
BTS for Answear: Scalable Fulfillment Center in Krakow
BTS for Hultafors: Production and Warehouse Facility with AutoStore
BTS for FIEGE and Zalando: Large-Scale Returns Logistics

Let's talk about your project

Please contact us to discuss your needs and find the perfect solution for your business.