...
7R Green Saver

Green Saver

  • min 50 % reduction of CO2 emissions*
  • min 50 % Reduction of primary energy demand**
  • Savings on operating costs for tenants
  • Designed to meet BREEAM Outstanding
* compared to buildings developed in accordance with Polish Construction Law
** compared to Polish building code

Case study

7R Park Wrocław West II

Area: 44 000 m2
Tenant: Yusen Logistics
Certification:BREEAM Outstanding

The most important green solutions
in the building

  • heating and ventilation systems with high-efficiency heat pumps and ventilation with heat recovery
  • advanced BMS control system
  • energy-efficient LED lighting with DALI control
  • photovoltaic installation
  • own energy storage

Expected result

  • reduction in operational CO2 emissions of more than 50%*
  • reduced primary energy demand by almost
    70% per annum **
* in relation to buildings constructed in accordance with technical conditions under building regulations
** in relation to current regulations, per m2

 

Highest BREEAM outstanding score

 

7R Park Wrocław West II achieved 95,6% in the BREEAM International New Construction Version 6 scheme.

This is the highest score for an industrial building in continental Europe.

The result confirms the effectiveness of the sustainable solutions in the 7R Green Saver line, designed to benefit both tenants and investors.

 

Watch the video

7R Park Przylesie

Area: 12 600 m2
Tenant: Grupa Eberspächer
Certification:BREEAM Outstanding

The most important green solutions
in the building

  • heating and ventilation systems with high-efficiency heat pumps and heat recovery ventilation.
  • increased airtightness of the building
  • advanced BMS
  • energy-efficient LED lighting with DALI control
  • photovoltaic installation
  • prepared for own battery energy storage unit

Expected result

  • reduction in operational CO2 emissions by approx. 50%*.
  • reduced primary energy demand by up to 70 % per annum**
* compared to buildings constructed in accordance with technical conditions under building regulations
** compared to current regulations, per m2.

Contact us

    0/400